Friday, May 18th, 2012

Building Structure and Improvement


The Guild will evaluate the LHS Building in collaboration with Administration to determine the following:

A.  Identify areas in the building where tiles must be repaired.  The long hallway on the first floor is targeted for replacement in the Summer of 2012.

B.  Develop a Safety and Security Committee to address driver safety around the LHS building, to determine new signage for speed limits, and to obtain bids for a school security system.

C.  Identify remodeling needs (paint, carpet, furnishings) to be completed in various areas of LHS.  The Vice Principal’s office is targeted for Summer 2012.