Building Structure and Improvement
The Guild will evaluate the LHS Building in collaboration with Administration to determine the following:
A. Identify areas in the building where tiles must be repaired. The long hallway on the first floor is targeted for replacement in the Summer of 2012.
B. Develop a Safety and Security Committee to address driver safety around the LHS building, to determine new signage for speed limits, and to obtain bids for a school security system.
C. Identify remodeling needs (paint, carpet, furnishings) to be completed in various areas of LHS. The Vice Principal’s office is targeted for Summer 2012.